| Designed to handle an annual throughput of 8 million TEU. | |
| Total Area | 1.2 million sqm | | Total ground slots | 29,785 TEUs | | Storage capacity | 200,000 TEUs | | Reefer points | 4,000 points |
|
|
| | |
| Linear berths | 6 berths of 360 metres each (totaling 2.16 km) | | Draft alongside | 15 metres | | Turning basin | 600 metres | |
|
| | |
| Linear berths | 8 berths of 360 metres (totaling 2.88km) | | Draft alongside | 17 - 19 metres |
| |
|
| | |
| Cranes | 36 Quay-side cranes 2 mobile Harbour crane | | Rubber-Tyred Gantry (RTG) cranes | 106 units operational | | Stacking capabilities | 1 over 5 high | | Other equipment and services | Full compliment of prime and service movers and trailers Maintenance and repair facilities for containers | |
|
| | 14 lane single entrance exit point GCAM-Gate Control Automated Management System Fully computerised for smooth flow reduced waiting time for faster truck turnaround | |
sekarang dah tak jadi lubuk wang...lubuk antu...hehehee
ReplyDeletejanji tetap lubuk min..bila mau singgah kedai?
ReplyDelete